Table 1-27 Fiscal Year 2000 Dredging Costs

Table 1-27
Fiscal Year 2000 Dredging Costs

Excel | CSV

  Dredging expenditures (thousands of dollars) Cubic yards dredged (thousands of cubic yards)
Federal Nonfederal Work for others (reimburse) Federal Nonfederal Work for others (reimburse)
Contract (O&M, CG, MR&T)            
Maintenance:            
Hopper 72,388.3 1,969.3 9,202.1 34,513.5 650.8 2,272.0
Nonhopper 352,868.4 7,628.7 8,430.3 141,208.2 547.7 2,624.8
New work:            
Hopper 43,907.5 12,732.1 942.0 12,817.4 4,051.3 293.0
Nonhopper 139,159.8 64.964.2 18,983.4 26,801.5 13,312.5 1,354.9
Government Plant (O&M, CG, MR&T)            
Maintenance:            
Hopper 47,085.3 0.0 0.0 15,514.7 0.0 0.0
Nonhopper 38,011.3 0.0 3,405.0 28,750.7 0.0 619.0
New work:            
Hopper 0.0 0.0 0.0 0.0 0.0 0.0
Nonhopper 0.0 0.0 0.0 0.0 0.0 0.0
PL-99 Work (emergency) Contract:            
Hopper 0.0 0.0 0.0 204.0 0.0 0.0
Nonhopper 0.0 0.0 0.0 0.0 0.0 0.0
Government plant:            
Hopper 0.0 0.0 0.0 0.0 0.0 0.0
Nonhopper 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL Corpswide Dollars = 821,677.7   Cubic yards = 285,332.0  

KEY: CG = Coast Guard; O&M = Operation and Maintenance; MR&T = Mississippi River and tributaries.

NOTE: A hopper loads material dumped into it by a dredger and discharges the cargo through the bottom.

SOURCE: U.S. Army Corps of Engineers, Navigation Data Center, available at http://www.wrsc.usace.army.mil/ndc/dd00cos1.htm, as of June 21, 2001.