Inland Waterway Commercial Vessel and Tow Delay

Inland Waterway Commercial Vessel and Tow Delay

Monthly data, not seasonally adjusted

Excel | CSV | Table Version

Inland Waterway Commercial Vessel and Tow Delay. If you are a user with disability and cannot view this image, use the table version. If you need further assistance, call 800-853-1351.

For reporting rivers, inland commercial traffic in 2010 spent 236,117 hours in lockage and 250,376 hours waiting for lockage. The greatest total delay in 2010 was at Lock 52 on the Ohio River, with 45,270 hours.

Monthly data, 12-month centered moving average

Inland Waterway Commercial Vessel and Tow Delay. If you are a user with disability and cannot view this image, use the table version. If you need further assistance, call 800-853-1351.

A moving average facilitates analysis of trends in highly variable data series.

Commercial Vessel and Tow Delay Sep-10 Sep-11
Total Ohio River System Hours of Delay 24,887 20,335
Percent change from same month previous year 100.0 -18.3
Total Upper Mississippi River System Hours of Delay 5,577 4,671
Percent change from same month previous year 75.1 -16.2
Total Other Waterway Systems Hours of Delay 669 1,958
Percent change from same month previous year -14.5 192.5

NOTES: Data for the Upper Mississippi River System includes the Mississippi (north of the Ohio confluence), Illinois, Chicago, and Kaskaskia Rivers. Data for the Ohio River System includes the Ohio, Cumberland, Green, Barren, Kanawha, Allegheny, and Monongahela Rivers. Other rivers for which data are available are the Arkansas River, which has a confluence with the Mississippi below the Ohio, and the Tennessee and Clinch Rivers, which ultimately flow into the Ohio, but also feed traffic to the Tennessee-Tombigbee Waterway.

SOURCE: U.S. Army Corps of Engineers, Navigation Information Connection, Operations and Maintenance of Navigation Installations Report 10W, available at http://www2.mvr.usace.army.mil/nic2/default.cfm as of October 2011.