Skip to Content Skip to Search Skip to Left Navigation U.S. Department of Transportation (US DOT) Research and Innovative Technology Administration (RITA) Research and Innovative Technology Administration (RITA) - U.S. Department of Transportation (USDOT)Bureau of Transportation Statistics (BTS) - Research and Innovative Technology Administration (RITA) - United States Department of Transportation (USDOT, US DOT or DOT)
  ABOUT RITA | CONTACT US | PRESS ROOM | CAREERS | SITE MAP
Bureau of Transportation Statistics
Intelligent Transportation Systems
National Transportation Library
Research, Development and Technology
Transportation Safety Institute
University Transportation Centers
Volpe National Transportation Systems Center
Printable Version

Master Item Table

Excel | CSV

No. Group Timeframe Score Key Area Criticality Fully Addressed Addressed, Monitoring Addressed, Not Adequately Not Addressed Notes
1 Crosscut     Materials Compatibility            
1.1 Crosscut 20 Embrittlement High     X    
1.2 Crosscut 20 Purity Effects High     X    
1.3 Crosscut 20 Pressure Level High     X    
1.4 Crosscut 20 Temperature Range High     X    
1.5 Crosscut 40 Pressure and Temperature Interactions High       X  
1.6 Crosscut 20 Testing Methods High     X    
1.7 Crosscut 20 Higher Strengths High     X    
1.8 Crosscut 40 Loss of Fatigue and Impact Strength High       X  
2 Pipeline     Hydrogen Piping and Pipelines Codes and Standards           A
3 Pipeline 40 Class Locations High       X  
4 Pipeline 40 Conversion to Service High       X  
5 Pipeline 24 Customer Notification Med       X  
6 Pipeline 24 Composite Reinforced Pipe Med       X  
7 Pipeline 20 Pipe Design High     X   A
8 Pipeline 20 Pipeline Component Design High     X    
9 Pipeline 20 Welding of Steel High     X    
10 Pipeline 40 Joining Other than Welding High       X  
11 Pipeline 20 Construction Requirements High     X    
12 Pipeline 24 Customer Meters, Regulators, and Service Lines Med       X  
13 Pipeline 40 Corrosion Control High       X  
14 Pipeline     Test Requirements            
14.1 Pipeline 10 ASTM F519 Hydrogen Embrittlement Test High   X      
14.2 Pipeline 20 Tensile Tests High     X    
14.3 Pipeline 20 KIH and KIC Stress Intensity Factors High     X    
14.4 Pipeline 20 Fatigue Crack Growth High     X    
14.5 Pipeline 20 Burst High     X    
14.6 Pipeline 20 Composite Pipe High       X  
14.7 Pipeline 40 Plastic Pipe High       X  
15 Pipeline 40 Uprating High       X  
16 Pipeline     Operations            
16.1 Pipeline 20 Procedural Manual for Operations, Maintenance, and Emergencies High     X    
16.2 Pipeline 40 Change in Class Location High       X  
16.3 Pipeline 40 Continuing Surveillance High       X  
16.4 Pipeline 40 Damage Prevention Program High       X  
16.5 Pipeline 12 Emergency Plans Med     X    
16.6 Pipeline 24 Public Education: Emergencies Med       X  
16.7 Pipeline 40 Investigation of Failures High       X  
16.8 Pipeline 20 Maximum Allowable Operating Pressure: Steel and Polyethylene Pipelines High     X    
16.9 Pipeline 12 Maximum Allowable Operating Pressure: High Pressure Distribution Systems Med     X    
16.10 Pipeline 12 Maximum And Minimum Allowable Operating Pressure: Low Pressure Distribution Systems Med     X    
16.11 Pipeline 40 Odorization of Gas High       X  
16.12 Pipeline 40 Tapping Pipelines Under Pressure High       X  
16.13 Pipeline 40 Purging of Pipelines High       X  
17 Pipeline     Maintenance            
17.1 Pipeline 12 Transmission Lines: Patrolling Med     X    
17.2 Pipeline 40 Transmission Lines: Leakage Surveys High       X B
17.3 Pipeline 20 Transmission Lines: Repair of Leaks, Welds, etc. High     X    
17.4 Pipeline 12 Distribution Systems: Patrolling Med     X    
17.5 Pipeline 40 Distribution Systems: Leakage Surveys High       X B
17.6 Pipeline 12 Test Requirements for Reinstating Service Lines Med     X    
17.7 Pipeline 40 Abandonment or Deactivation of Facilities High       X  
17.8 Pipeline 12 Compressor Stations: Reliefs and Combustible Storage Med     X    
17.9 Pipeline 20 Compressor Stations: Gas Detection High     X    
17.10 Pipeline 12 Pressure Limiting and Regulating Stations: Inspection, Testing, Reliefs, etc. Med     X    
17.11 Pipeline 12 Valve Maintenance: Transmission and Distribution Lines Med     X    
17.12 Pipeline 12 Vault Maintenance Med     X    
17.13 Pipeline 40 Prevention of Accidental Ignition High       X  
17.14 Pipeline 40 Qualification of Pipeline Personnel High       X  
17.15 Pipeline 40 Pipeline Integrity Management High       X  
18 Transport     Hazard and Packaging Class for Hydrides, Cryogas, Physisorption, Reactives            
18.1 Transport 12 Tests for Appropriate Class Determination Med     X   C
18.2 Transport 40 Packaging Instructions for Micro Metal Hydride Hydrogen Storage Systems High       X  
18.3 Transport 40 Packaging Instructions for Portable Metal Hydride Hydrogen Storage Systems High       X  
18.4 Transport 20 Reactive Hydrogen Storage May Be Mixtures High     X    
19 Transport     Emergency Response            
19.1 Transport 10 Emergency Response Information: High Pressure Gas, Steel High   X      
19.2 Transport 20 Emergency Response Information: High Pressure Gas, Composite High     X    
19.3 Transport 20 Emergency Response Information: Cryogenic High     X    
19.4 Transport 20 Emergency Response Information: Metal Hydride High     X    
19.5 Transport 20 Emergency Response Information: Cryogas High     X    
19.6 Transport 20 Emergency Response Information: Physisorption High     X    
19.7 Transport 20 Emergency Response Information: Complex Hydrides High     X    
19.8 Transport 20 Emergency Response Information: Reactive (Including Methanol) High     X    
20 Transport 20 Training High     X    
21 Transport 12 Security Plans Med     X    
22 Transport 24 Filling and Purging Requirements for Advanced Media Med       X  
23 Transport 24 Filling and Purging Requirements for High Pressure Containers Med       X  
24 Transport 24 Loading and Unloading Requirements for Composite Containers Med       X  
25 Transport     Container Specifications            
25.1 Transport 40 Container Specifications for Composite Storage High       X C
25.2 Transport 40 Container Specifications For Metal Hydride Based Storage High       X C
25.3 Transport 24 Container Specifications For Reactive Type Storage Med       X C
26 Transport 20 Composite/Novel Media Tube Trailer Specifications High     X    
27 Transport 12 Composite/Novel Media Portable Tank Specifications Med     X    
28 Transport 4 Continuing Qualification and Maintenance Low     X    
29 Transport 40 Mobile Fuelers, Treatment of Gas Storage Containers High       X  
30 Transport     Aircraft Carriage            
30.1 Transport 40 Aircraft Carriage: Hydride Systems High       X  
30.2 Transport 40 Aircraft Carriage: Hydride Systems in Appliances High       X  
31 Transport 20 Pressure Relief Devices: High Pressure High     X    
32 Transport 20 Pressure Relief Valves: High Pressure High     X    
33 Transport 20 Valves: High Pressure High     X    
34 Transport 20 Welding High     X    
35 Transport 20 Tubing and Fittings: High Pressure High     X    

♦ Near term: 0 to 5 years

◊ Long term: 5 to 15 years

A Higher order--work in other areas will define requirements

B Sensor technology will influence leak survey requirements

C System-level consideration/requirements