| 1 |
Crosscut |
|
|
Materials Compatibility |
|
|
|
|
|
|
| 1.1 |
Crosscut |
♦ |
20 |
Embrittlement |
High |
|
|
X |
|
|
| 1.2 |
Crosscut |
♦ |
20 |
Purity Effects |
High |
|
|
X |
|
|
| 1.3 |
Crosscut |
♦ |
20 |
Pressure Level |
High |
|
|
X |
|
|
| 1.4 |
Crosscut |
♦ |
20 |
Temperature Range |
High |
|
|
X |
|
|
| 1.5 |
Crosscut |
♦ |
40 |
Pressure and Temperature Interactions |
High |
|
|
|
X |
|
| 1.6 |
Crosscut |
♦ |
20 |
Testing Methods |
High |
|
|
X |
|
|
| 1.7 |
Crosscut |
♦ |
20 |
Higher Strengths |
High |
|
|
X |
|
|
| 1.8 |
Crosscut |
♦ |
40 |
Loss of Fatigue and Impact Strength |
High |
|
|
|
X |
|
| 2 |
Pipeline |
|
|
Hydrogen Piping and Pipelines Codes and
Standards |
|
|
|
|
|
A |
| 3 |
Pipeline |
◊ |
40 |
Class Locations |
High |
|
|
|
X |
|
| 4 |
Pipeline |
♦ |
40 |
Conversion to Service |
High |
|
|
|
X |
|
| 5 |
Pipeline |
◊ |
24 |
Customer Notification |
Med |
|
|
|
X |
|
| 6 |
Pipeline |
◊ |
24 |
Composite Reinforced Pipe |
Med |
|
|
|
X |
|
| 7 |
Pipeline |
♦ |
20 |
Pipe Design |
High |
|
|
X |
|
A |
| 8 |
Pipeline |
♦ |
20 |
Pipeline Component Design |
High |
|
|
X |
|
|
| 9 |
Pipeline |
♦ |
20 |
Welding of Steel |
High |
|
|
X |
|
|
| 10 |
Pipeline |
♦ |
40 |
Joining Other than Welding |
High |
|
|
|
X |
|
| 11 |
Pipeline |
♦ |
20 |
Construction Requirements |
High |
|
|
X |
|
|
| 12 |
Pipeline |
◊ |
24 |
Customer Meters, Regulators, and Service
Lines |
Med |
|
|
|
X |
|
| 13 |
Pipeline |
◊ |
40 |
Corrosion Control |
High |
|
|
|
X |
|
| 14 |
Pipeline |
|
|
Test Requirements |
|
|
|
|
|
|
| 14.1 |
Pipeline |
♦ |
10 |
ASTM F519 Hydrogen Embrittlement Test |
High |
|
X |
|
|
|
| 14.2 |
Pipeline |
♦ |
20 |
Tensile Tests |
High |
|
|
X |
|
|
| 14.3 |
Pipeline |
♦ |
20 |
KIH and KIC Stress Intensity Factors |
High |
|
|
X |
|
|
| 14.4 |
Pipeline |
♦ |
20 |
Fatigue Crack Growth |
High |
|
|
X |
|
|
| 14.5 |
Pipeline |
♦ |
20 |
Burst |
High |
|
|
X |
|
|
| 14.6 |
Pipeline |
◊ |
20 |
Composite Pipe |
High |
|
|
|
X |
|
| 14.7 |
Pipeline |
◊ |
40 |
Plastic Pipe |
High |
|
|
|
X |
|
| 15 |
Pipeline |
♦ |
40 |
Uprating |
High |
|
|
|
X |
|
| 16 |
Pipeline |
|
|
Operations |
|
|
|
|
|
|
| 16.1 |
Pipeline |
◊ |
20 |
Procedural Manual for Operations,
Maintenance, and Emergencies |
High |
|
|
X |
|
|
| 16.2 |
Pipeline |
◊ |
40 |
Change in Class Location |
High |
|
|
|
X |
|
| 16.3 |
Pipeline |
◊ |
40 |
Continuing Surveillance |
High |
|
|
|
X |
|
| 16.4 |
Pipeline |
◊ |
40 |
Damage Prevention Program |
High |
|
|
|
X |
|
| 16.5 |
Pipeline |
♦ |
12 |
Emergency Plans |
Med |
|
|
X |
|
|
| 16.6 |
Pipeline |
◊ |
24 |
Public Education: Emergencies |
Med |
|
|
|
X |
|
| 16.7 |
Pipeline |
◊ |
40 |
Investigation of Failures |
High |
|
|
|
X |
|
| 16.8 |
Pipeline |
♦ |
20 |
Maximum Allowable Operating Pressure:
Steel and Polyethylene Pipelines |
High |
|
|
X |
|
|
| 16.9 |
Pipeline |
♦ |
12 |
Maximum Allowable Operating Pressure: High
Pressure Distribution Systems |
Med |
|
|
X |
|
|
| 16.10 |
Pipeline |
◊ |
12 |
Maximum And Minimum Allowable Operating
Pressure: Low Pressure Distribution Systems |
Med |
|
|
X |
|
|
| 16.11 |
Pipeline |
♦ |
40 |
Odorization of Gas |
High |
|
|
|
X |
|
| 16.12 |
Pipeline |
♦ |
40 |
Tapping Pipelines Under Pressure |
High |
|
|
|
X |
|
| 16.13 |
Pipeline |
♦ |
40 |
Purging of Pipelines |
High |
|
|
|
X |
|
| 17 |
Pipeline |
|
|
Maintenance |
|
|
|
|
|
|
| 17.1 |
Pipeline |
◊ |
12 |
Transmission Lines: Patrolling |
Med |
|
|
X |
|
|
| 17.2 |
Pipeline |
♦ |
40 |
Transmission Lines: Leakage Surveys |
High |
|
|
|
X |
B |
| 17.3 |
Pipeline |
♦ |
20 |
Transmission Lines: Repair of Leaks,
Welds, etc. |
High |
|
|
X |
|
|
| 17.4 |
Pipeline |
◊ |
12 |
Distribution Systems: Patrolling |
Med |
|
|
X |
|
|
| 17.5 |
Pipeline |
♦ |
40 |
Distribution Systems: Leakage Surveys |
High |
|
|
|
X |
B |
| 17.6 |
Pipeline |
♦ |
12 |
Test Requirements for Reinstating Service
Lines |
Med |
|
|
X |
|
|
| 17.7 |
Pipeline |
◊ |
40 |
Abandonment or Deactivation of Facilities |
High |
|
|
|
X |
|
| 17.8 |
Pipeline |
♦ |
12 |
Compressor Stations: Reliefs and
Combustible Storage |
Med |
|
|
X |
|
|
| 17.9 |
Pipeline |
♦ |
20 |
Compressor Stations: Gas Detection |
High |
|
|
X |
|
|
| 17.10 |
Pipeline |
♦ |
12 |
Pressure Limiting and Regulating Stations:
Inspection, Testing, Reliefs, etc. |
Med |
|
|
X |
|
|
| 17.11 |
Pipeline |
♦ |
12 |
Valve Maintenance: Transmission and
Distribution Lines |
Med |
|
|
X |
|
|
| 17.12 |
Pipeline |
◊ |
12 |
Vault
Maintenance |
Med |
|
|
X |
|
|
| 17.13 |
Pipeline |
♦ |
40 |
Prevention of Accidental Ignition |
High |
|
|
|
X |
|
| 17.14 |
Pipeline |
♦ |
40 |
Qualification of Pipeline Personnel |
High |
|
|
|
X |
|
| 17.15 |
Pipeline |
♦ |
40 |
Pipeline Integrity Management |
High |
|
|
|
X |
|
| 18 |
Transport |
|
|
Hazard and Packaging Class for Hydrides,
Cryogas, Physisorption, Reactives |
|
|
|
|
|
|
| 18.1 |
Transport |
♦ |
12 |
Tests for Appropriate Class Determination |
Med |
|
|
X |
|
C |
| 18.2 |
Transport |
♦ |
40 |
Packaging Instructions for Micro Metal
Hydride Hydrogen Storage Systems |
High |
|
|
|
X |
|
| 18.3 |
Transport |
♦ |
40 |
Packaging Instructions for Portable Metal
Hydride Hydrogen Storage Systems |
High |
|
|
|
X |
|
| 18.4 |
Transport |
♦ |
20 |
Reactive Hydrogen Storage May Be Mixtures |
High |
|
|
X |
|
|
| 19 |
Transport |
|
|
Emergency Response |
|
|
|
|
|
|
| 19.1 |
Transport |
♦ |
10 |
Emergency Response Information: High
Pressure Gas, Steel |
High |
|
X |
|
|
|
| 19.2 |
Transport |
♦ |
20 |
Emergency Response Information: High
Pressure Gas, Composite |
High |
|
|
X |
|
|
| 19.3 |
Transport |
♦ |
20 |
Emergency Response Information: Cryogenic |
High |
|
|
X |
|
|
| 19.4 |
Transport |
♦ |
20 |
Emergency Response Information: Metal
Hydride |
High |
|
|
X |
|
|
| 19.5 |
Transport |
◊ |
20 |
Emergency Response Information: Cryogas |
High |
|
|
X |
|
|
| 19.6 |
Transport |
◊ |
20 |
Emergency Response Information:
Physisorption |
High |
|
|
X |
|
|
| 19.7 |
Transport |
◊ |
20 |
Emergency Response Information: Complex
Hydrides |
High |
|
|
X |
|
|
| 19.8 |
Transport |
♦ |
20 |
Emergency Response Information: Reactive
(Including Methanol) |
High |
|
|
X |
|
|
| 20 |
Transport |
♦ |
20 |
Training |
High |
|
|
X |
|
|
| 21 |
Transport |
♦ |
12 |
Security Plans |
Med |
|
|
X |
|
|
| 22 |
Transport |
◊ |
24 |
Filling and Purging Requirements for
Advanced Media |
Med |
|
|
|
X |
|
| 23 |
Transport |
♦ |
24 |
Filling and Purging Requirements for High
Pressure Containers |
Med |
|
|
|
X |
|
| 24 |
Transport |
♦ |
24 |
Loading and Unloading Requirements for
Composite Containers |
Med |
|
|
|
X |
|
| 25 |
Transport |
|
|
Container Specifications |
|
|
|
|
|
|
| 25.1 |
Transport |
♦ |
40 |
Container Specifications for Composite
Storage |
High |
|
|
|
X |
C |
| 25.2 |
Transport |
♦ |
40 |
Container Specifications For Metal Hydride
Based Storage |
High |
|
|
|
X |
C |
| 25.3 |
Transport |
♦ |
24 |
Container Specifications For Reactive Type
Storage |
Med |
|
|
|
X |
C |
| 26 |
Transport |
♦ |
20 |
Composite/Novel Media Tube Trailer
Specifications |
High |
|
|
X |
|
|
| 27 |
Transport |
◊ |
12 |
Composite/Novel Media Portable Tank
Specifications |
Med |
|
|
X |
|
|
| 28 |
Transport |
◊ |
4 |
Continuing Qualification and Maintenance |
Low |
|
|
X |
|
|
| 29 |
Transport |
♦ |
40 |
Mobile Fuelers, Treatment of Gas Storage
Containers |
High |
|
|
|
X |
|
| 30 |
Transport |
|
|
Aircraft Carriage |
|
|
|
|
|
|
| 30.1 |
Transport |
♦ |
40 |
Aircraft Carriage: Hydride Systems |
High |
|
|
|
X |
|
| 30.2 |
Transport |
♦ |
40 |
Aircraft Carriage: Hydride Systems in
Appliances |
High |
|
|
|
X |
|
| 31 |
Transport |
♦ |
20 |
Pressure Relief Devices: High Pressure |
High |
|
|
X |
|
|
| 32 |
Transport |
♦ |
20 |
Pressure Relief Valves: High Pressure |
High |
|
|
X |
|
|
| 33 |
Transport |
♦ |
20 |
Valves: High Pressure |
High |
|
|
X |
|
|
| 34 |
Transport |
♦ |
20 |
Welding |
High |
|
|
X |
|
|
| 35 |
Transport |
♦ |
20 |
Tubing and Fittings: High Pressure |
High |
|
|
X |
|
|